This reconstruction of a failed sea wall involved a high level of engineering complexity and difficult access, both challenges suiting KMD Stonemasonry’s experienced construction team.

They were engaged to demolish the existing wall and adjoining access stairs, install new concrete footings, and rebuild the sea wall using stone cut from a building site in Sydney’s CBD, with all materials required to be brought to site on a barge.